FBMG-021 | Fort Buchanan Microgrid | Contingent opportunity
WORK LOCATION: HYBRID - remote procedure review; ON ISLAND for startup, inspection, testing, and integrated commissioning
| REQUISITION | FBMG-021 |
| CSS CAM LCAT | 140 - Senior Technical Staff Member (Mechanical Commissioning) |
| DUTY LOCATION | Hybrid with Fort Buchanan, Puerto Rico and potential FAT travel |
| WORK ARRANGEMENT | HYBRID - remote procedure review; ON ISLAND for startup, inspection, testing, and integrated commissioning |
| REPORTS TO | Lead Commissioning Specialist through independent Commissioning Firm |
| EMPLOYMENT | Contingent specialist pipeline; compliant independent-firm engagement required |
| REQUIREMENT BASIS | SOLICITATION-MANDATED independent Commissioning Firm specialist |
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is deploying a project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.
Lead independent commissioning of power-generation mechanical systems, including diesel generators and auxiliaries, fuel/DEF interfaces, cooling, ventilation, exhaust, fire-protection interfaces, and related controls. The specification references natural-gas experience; candidates with both gaseous- and liquid-fuel generation experience are strongly preferred because the project documents contain both template and project-specific references.