FBMG-017 | Fort Buchanan Microgrid | Contingent opportunity
WORK LOCATION: REMOTE/HYBRID - remote document coordination; ON ISLAND for field verification, critical design reviews, and issue resolution
| REQUISITION | FBMG-017 |
| CSS CAM LCAT | 650 - Principal Engineer/IT Staff Member (Design Quality) |
| DUTY LOCATION | United States remote/hybrid with required Puerto Rico visits |
| WORK ARRANGEMENT | REMOTE/HYBRID - remote document coordination; ON ISLAND for field verification, critical design reviews, and issue resolution |
| REPORTS TO | CQC System Manager; independent coordination with Project Manager and EOR |
| EMPLOYMENT | Full-time or dedicated consultant; contingent |
| REQUIREMENT BASIS | SOLICITATION-MANDATED CQC organization function |
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is deploying a project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.
Assure that all project design documents, calculations, shop drawings, delegated designs, field changes, and as-built information are coordinated and meet professional architectural and engineering quality standards. The DQCM provides independent design-quality governance within the CQC organization.