FBMG-025 | Fort Buchanan Microgrid | Contingent opportunity
WORK LOCATION: ON ISLAND / PHASE-BASED - physical presence required while work in the assigned area is underway
| REQUISITION | FBMG-025 |
| CSS CAM LCAT | 630-650 - Engineer/IT Staff Member (discipline/experience dependent) |
| DUTY LOCATION | Fort Buchanan, Guaynabo, Puerto Rico during assigned work |
| WORK ARRANGEMENT | ON ISLAND / PHASE-BASED - physical presence required while work in the assigned area is underway |
| REPORTS TO | CQC System Manager |
| EMPLOYMENT | Full-time, part-time, or phase-based; prime or subcontractor employee; contingent |
| REQUIREMENT BASIS | SOLICITATION-MANDATED specialized CQC personnel by area of responsibility |
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is developing a contingent project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.
Provide discipline-specific construction quality control for civil, geotechnical, mechanical, electrical, structural, environmental, concrete/pavements/soils, or IT/communications work. Specialists are responsible to the CQC System Manager, must be physically present during work in their assigned area, and perform no duty other than quality control while carrying out the CQC function.