FBMG-009 | Fort Buchanan Microgrid | Contingent opportunity
WORK LOCATION: ON ISLAND - full-time; short remote pre-mobilization period permitted
| REQUISITION | FBMG-009 |
| CSS CAM LCAT | 8A - Program Support Specialist (nonexempt administrative) |
| DUTY LOCATION | Fort Buchanan, Guaynabo, Puerto Rico |
| WORK ARRANGEMENT | ON ISLAND - full-time; short remote pre-mobilization period permitted |
| REPORTS TO | CQC System Manager with functional coordination to Project Manager |
| EMPLOYMENT | Full-time, project-based; contingent |
| REQUIREMENT BASIS | SOLICITATION CQC matrix requires submittal support and site records; execution-critical |
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is deploying a project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.
Control the information that controls the work. This position manages RMS Contractor Mode, submittals, RFIs, transmittals, daily records, drawing/specification revisions, correspondence, meeting records, closeout documents, and the site document repository. The role supports CQC certification but does not replace the CQC Manager's approval authority.