Qualified Fire Protection Engineer (QFPE)
FBMG-024 | Fort Buchanan Microgrid | Contingent opportunity
WORK LOCATION: REMOTE/HYBRID - remote design/submittal review; ON ISLAND for rough-in surveillance, pre-Government testing, final Government testing, and final review
| REQUISITION | FBMG-024 |
| CSS CAM LCAT | 650 - Principal Engineer/IT Staff Member (Fire Protection) |
| DUTY LOCATION | United States remote/hybrid with required Fort Buchanan site attendance |
| WORK ARRANGEMENT | REMOTE/HYBRID - remote design/submittal review; ON ISLAND for rough-in surveillance, pre-Government testing, final Government testing, and final review |
| REPORTS TO | Project Manager / CQC System Manager; professional responsibility remains with QFPE |
| EMPLOYMENT | Part-time or project-specific consultant; contingent |
| REQUIREMENT BASIS | SOLICITATION-MANDATED licensed specialist |
About ERP and the Project
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is developing a contingent project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.
Position Summary
Provide professional fire-protection engineering oversight for the BESS enclosure wet-pipe sprinkler and associated fire/life-safety interfaces. The QFPE reviews and stamps required submittals, performs construction surveillance, witnesses testing, and certifies compliant installation.
What You Will Do
- Prepare or directly supervise required shop drawings and hydraulic calculations and review complete SD-02/SD-03/SD-05 packages.
- Affix PE stamp/signature to required drawings, calculations, material data, review letters, and certificates.
- Perform rough-in surveillance before concealment and coordinate sprinkler, fire alarm, switchgear, BESS, water supply, and seismic interfaces.
- Attend pre-Government testing, witness final Government testing, verify correction of deficiencies, and issue compliant-installation documentation.
- Support RFIs, field changes, closeout, test certificates, and final installation review.
Minimum Qualifications
- Active Professional Engineer license and successful completion of the NCEES fire protection engineering examination.
- Relevant fire-protection engineering experience with NFPA 13 sprinkler design, hydraulic calculations, submittal review, construction surveillance, and acceptance testing.
- Ability to seal required documents in an accepted jurisdiction and obtain Puerto Rico registration if required.
- Ability to travel to Puerto Rico for required inspections and tests.
Preferred Qualifications
- BESS/NFPA 855/UL 9540/9540A, federal/DoD, fire alarm, seismic bracing, and USACE submittal experience.
- Spanish proficiency.
Field, Travel and Employment Conditions
- This is a contingent opportunity dependent on contract award/NTP, project funding, final staffing authorization, Government acceptance when required, and successful installation-access processing.
- When on site, work may involve tropical heat and humidity, rain, uneven terrain, stairs/ladders, construction noise, required PPE, and extended, weekend, outage, emergency, or alternate-shift hours.
- Candidates must be authorized to work in the United States, follow drug-free workplace and conduct requirements, and protect FCI/CUI using only authorized systems and procedures.
- ERP encourages applications from qualified Native American, Puerto Rican, veteran, military-spouse, disabled, and local candidates. ERP provides equal employment opportunity consistent with applicable law.
Application Materials
- Resume showing month/year dates, employer, role, project scope/value, client, and personal responsibilities.
- Copies of required current licenses/certifications with expiration dates.
- Comparable-project list and references where requested, Puerto Rico availability, earliest mobilization date, and requested employment/consulting arrangement.