Senior Project Scheduler - Primavera P6
Remote
Full Time
Experienced
FBMG-007 | Fort Buchanan Microgrid
| WORK LOCATION: HYBRID - remote schedule production; monthly update meetings in person unless the Contracting Officer approves virtual attendance |
| REQUISITION | FBMG-007 |
| CSS CAM LCAT | 140 - Senior Technical Staff Member (Project Scheduling) |
| DUTY LOCATION | Remote planning base with recurring duty at Fort Buchanan, Puerto Rico |
| WORK ARRANGEMENT | HYBRID - remote schedule production; monthly update meetings in person unless the Contracting Officer approves virtual attendance |
| REPORTS TO | Project Manager / Project Controls Manager |
| EMPLOYMENT | Full-time or dedicated consultant; |
| REQUIREMENT BASIS | SOLICITATION-MANDATED qualified scheduler |
About ERP and the Project
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP is deploying a project team for the Fort Buchanan installation-level microgrid in Puerto Rico. The work includes diesel generation, medium-voltage distribution, microgrid controls, protective relaying, fuel infrastructure, fiber communications, optional BESS, integration of existing renewable generation, and full system commissioning.Position Summary
Build and maintain the cost-loaded Primavera P6 schedule that governs planning, progress measurement, payment support, procurement, design/submittals, construction, testing, commissioning, and closeout. The scheduler must facilitate real-time Government update meetings and convert field facts into a credible critical-path forecast.What You Will Do
- Develop preliminary, initial, and periodic P6 schedules compliant with USACE activity, coding, logic, cost-loading, calendar, milestone, and reporting requirements.
- Integrate design/permit, submittal, procurement, delivery, construction, outage, FAT/SAT, commissioning, training, O&M, as-built, and closeout activities.
- Lead monthly update workshops; organize, sort, filter, analyze, and revise the live schedule as approved by the Government.
- Produce narratives, network diagrams, critical-path analysis, cash-flow/S-curves, earned value, schedule variance, and three-week look-aheads.
- Prepare recovery schedules, fragnets, prospective time-impact analyses, and retrospective delay analyses when required.
- Reconcile field planning, QC daily reports, RMS data, procurement status, and invoicing with the approved schedule.
Minimum Qualifications
- Prepared and maintained at least three Primavera P6 construction schedules for projects of similar size and complexity.
- Comprehensive knowledge of CPM scheduling principles and practical application.
- At least 7 years of construction scheduling experience, including cost and resource loading on federal, utility, industrial, or mission-critical projects.
- Ability to travel to Puerto Rico for update meetings and workshops; monthly in-person attendance is the default contract expectation.
Preferred Qualifications
- AACE PSP, PMI-SP, or related credential.
- USACE ER 1-1-11, RMS, earned value, Unanet, and microgrid/power-project experience.
- Time-impact and forensic schedule-analysis experience under AACE 29R-03 and 52R-06 concepts.
Field, Travel and Employment Conditions
- When on site, work may involve tropical heat and humidity, rain, uneven terrain, stairs/ladders, construction noise, required PPE, and extended, weekend, outage, emergency, or alternate-shift hours.
- Candidates must be authorized to work in the United States, follow drug-free workplace and conduct requirements, and protect FCI/CUI using only authorized systems and procedures.
- ERP encourages applications from qualified Native American, Puerto Rican, veteran, military-spouse, disabled, and local candidates. ERP provides equal employment opportunity consistent with applicable law.
Application Materials
- Resume showing month/year dates, employer, role, project scope/value, client, and personal responsibilities.
- Copies of required current licenses/certifications with expiration dates.
- Comparable-project list and references where requested, Puerto Rico availability, earliest mobilization date, and requested employment/consulting arrangement.
Apply for this position
Required*